Location of Our Homes

Our homes are located in Acomb, off Tudor Road, west of York city centre. Our site sits in the South-east corner of a larger housing development (also called Lowfield Green), although we are a completely separate development.

We are only a few minutes away from the local leisure centre, library, West Bank Park and Acomb high-street including small independent shops and businesses; plus a number of local schools and churches. With good links into the city centre, we are well connected with the rest of York through main bus routes and cycle tracks.

How to get to us

By Bus – nearest buses from the city centre/railway station are No. 4 which stops on Tudor Road or the No. 5 which stops on Acomb Front Street.

By Car – parking is limited where we are so if you are visiting us by car, we encourage you to park at Morrisons which is free and only a 10 minute walk away.

FIND US with what3words: ///music.silks.vital

1-19, Lowfields, Rosemary Road, York. YO24 3FX

Our Homes

We have almost completed the first bit of the project with 14 houses being built in Phase 1, ranging from 2 to 4-beds with both private and shared outdoor space. Our homes currently include:

  • 4 bed houses (full)
  • 3 bed houses (full)
  • 2 bed houses (full)
  • 2 bed flats (express you interest in Phase 2)

Features of our Community

  • Secure bike storage
  • 12 parking spaces for car sharing
  • Car-free, outside spaces for Members to enjoy
  • Areas for growing food
  • Sharing of resources and equipment (ie. we don’t need 19 lawnmowers on site!)
  • Regular community meals and activities
  • No gas. All power on site is electric (solar panels to be added in Phase 2)
  • Home are heated by air source heat pumps
  • All homes are insulated to passivHaus standards

If you are interested in being on our reserve lists for a our or would like to be considered to become a resident in Phase 2 please register your interest

Timeline

All residents of Phase 1 have now moved in. There are still areas which are due for completion such as the car park, workshop, external paths and landscaping.

Phase 2 (flats)

  • Planning permission was granted for Phase 2 – 2025
  • Building work to commence Autumn 2026
  • Residents to move in Summer/Autumn 2027